some text2800 De La Cruz Project

2800 De La Cruz is a beautiful project recently completed by Technical Builders. This 16,000 sq ft building was completely renovated with new finishes, open ceiling, a new bathroom with high end architectural features, a modern break room, and new lighting throughout. This project also included an exquisitely designed exterior amenities area with a feature [...]

some text42 Fremont Project

This was an interior improvement project totaling 50,000 sf. The project included converting basic office space into open concept, open ceiling design including a staffing area with kitchen, server room encased in 12’ tall glass walls, new restrooms, and four student collaboration areas each with unique, high-end finishes. The project also included newly designed Corian [...]

some textSmart World Images

This is a design-build project currently under construction. The project consists of adding an 80’ x 60’ 3,000,000 pound concrete bunker that will be used to sterilize medical devices with radiation. This project will be completed in March, come back soon to see the progress!               Some facts about [...]

some textIntelicare Direct Images and Video

This state of the art customer service center was a design-build project that was created with the employee in mind. The client wanted to move away from the typical “cubical farm”, a standard format in their industry, toward an atmosphere that would inspire collaboration and teamwork, stressing the importance of putting people before profits. This [...]

some textThe Goertek Project Images

              This 30,000 sf tenant improvement was located on the 3rd floor of an occupied warm shell mid-rise building. The project combines artistic expression, open collaboration and technical functionality that creates a feeling of happiness and efficiency. One highlight of the project is an ornate Interlam feature wall that [...]

some textCogswell College Images

This 45,000 sf design-build project for one of the premiere accredited poly-technical colleges had some of the most extreme time constraints Technical Builders has faced. The project consisted of 18 classrooms, student breakroom, 15 offices, a conference room, three collaboration rooms, site work, structural seismic upgrades, Title 24 upgrades, exterior painting, overcoat/re-striping of the parking [...]

some textEmerald Therapeutics Time Lapse Video

Check out this amazing time lapse video of a project we worked on for Emerald Therapeutics!!